Perry High School 1.8 kW Wind Turbine

1 Success Blvd
Perry
OH 44081

Perry High School 1.8 kW Wind Turbine

VindkraftMiljövårdsundervisningSkola

Översikt

Ingen har röstat än

The school features a Skystream 3.7 wind generator (1.8 kW) connected to the grid, along with a meteorological monitoring station, which monitors wind speed, wind direction, air temperature, and solar intensity (insolation). The meteorological monitoring station has 3 anemometers installed at different heights on an existing light pole within the football/soccer stadium. Installed in 2008, these technologies allow monitoring data remotely or from a computer located in one of the high school classrooms. Perry will be implementing a student-centered cross-curricular program on energy resources, utilizing these installations to generate dialogue and encourage learning.

http://www.greenenergyohio.org/ost/siteDetail.cfm?site_id=127

Location:

Javascript is required to view this map.

Kommentarer

Kopplingar

Jämför relaterade platser, utforska de relaterade kartorna, ta reda på mer om volontärarbete, hur man kommer till en plats och mycket mer. Snart kommer du också att hitta sätt att dela denna kartan här.

Hur man kommer hit

Alla platser med samma primära ikon på Open Greenmap länkas automatiskt här. Du kan jämföra olika strategier och lösningar på denna karta och andra kartor runt om i världen.
Relaterade platser i världen
Välj en kopplingskategori från listan till vänster.

Multimedia

Registered users can post photos, videos, and documents here.

Påverkan

Ingen påverkan har registrerats för denna plats än - du kan bli först!

Donate to GreenMaps