Two story, four bedroom, single family residence, Bellmore Passive House









このサイトについて
The construction of this project started in March 2014. Expected completion of the house is November 2014.
Fire caused by “Sandy” destroyed the existing house, leaving an empty lot with only the original foundation remaining. The client’s desires to have a resilient energy efficient new home led to the selection of the Passive House goals and strategies.
The new house is a two story, four bedroom, 2025 SF TFA single family residence. The house is constructed of pre-insulated structural panels for the walls and roof and the floor systems constructed of engineered joist. The windows are triple glazed UPVC tilt and turn units. A two head ducted mini-split system provides the heating and cooling with a separate ERV unit to provide the balanced ventilation. The domestic hot water is provided by a heat pump unit. The lighting is LED lamps. The house is supported by a 7.5 Kw PV array.
Status: Under Construction
Architect: Anthony Musso and Nina Shah-Giannaris
Contractor: LDA Home Improvements and PRHG General Contracting
The plumbing contractor is Valentino Plumbing and Heating, and the HVAC contractor is Ultimate Comfort Heating and Cooling.
Location:
コメント
コネクション
- Brooklyn
- Brooklyn
- Long Island City
- High Falls
- Saugerties
-
- Cold Spring
- New York
- Ramsey
- Long Branch
- Den HaagNetherlands
- CockeysvilleUnited States
- AkronUnited States
- 121 53 Johanneshov
- Netherlands
- United States
- DubuqueUnited States
- Spain
- DetroitUnited States
- OaklandUnited States
- United States
- Atlanta, GA
- NokomisUnited States
- New YorkUnited States
- RonnebySweden
- United States
- BronxUnited States
- Staten IslandUnited States
- New YorkUnited States
- United States
- Atlanta, GA
- United States
- Spain
- BronxUnited States
- Long Island CityUnited States
マルチメディア
インパクト
まだ誰からもインパクトは報告されていません!一番目になりませんか?
新しいコメントの投稿